Building.hk eBulletin  

 

Industry News <Search  <Archives  <eBulletin   Next>  


January 3, 2012

TLD introduces new formwork systems to celebrate its 10th Anniversary
To celebrate the 10th Anniversary of TLD Formwork, three new formwork systems will be introduced for the first time to both domestic and overseas contractors at the TLD Open Day to be held on January 9 (Monday), 2012.
 
Table Form
A modular, panelised decking system that simplifies assembly shortens production time and saves costs. This system is easily adapted for use on any kind of building.
 
Flying Form
Lightweight, mechanically connected modular components which are easy to handle and retain required rigidity. This system can be quickly dismantled and assembled in different configurations
 
Dek Form
Consist of standard truss modules which can be connected to other trusses to increase truss length. Also provides the best solution where beams need to be formed.
 
TLD Metalwork (Shenzhen) Co Ltd was established in 1997. In the early stages, the company specialized in the fabrication of high quality architectural products supplied to many prestigious projects in Hong Kong, China and the US. From the year 2000, TLD expanded its product line to include aluminium formwork by providing design, fabrication and trial assembling at its own factory under the registered trade name of TLD Formwork.
     In the past decade, TLD has successfully supplied high quality formwork systems to many prestigious projects in Hong Kong, Macau and Mainland China. TLD Formwork System is also exported in large quantity to overseas markets such as Dubai, India, Mexico and Brazil.
     Today, TLD Formwork is probably the largest aluminium formwork fabricator in southern China. The TLD fabrication centre in Dongguan has expanded recently to increase production capacity in order to meet market demand.


Join us on the Open Day on January 9, 2012

TLD Formwork 10th Anniversary Open Day Pogramme
7:00 am to 9:00 am   Shuttle bus pick up at Zhangmotou Railway Station  (ÕÁľî^»ð܇վ)
10:00 am                   Opening ceremony
10:30 am                   Guided tour of TLD Production Plant
11:00 am                   Inspection of new formwork systems
12:00 noon                Buffet lunch and leisure activities
Shuttle bus service from TLD factory to Zhangmotou Railway Station (ÕÁľî^»ð܇վ)

For reservation and enquiries please call:
Mr Yang (Tel: 86- 13802573880) or Mr Ngan (Tel: 86- 13602639048)




Table Form


Flying Form


Dek Form




Contact TLD Formwork System
Website www.tldformwork.com
Email [email protected]

Copyright © Building.hk All rights reserved.