Building.hk eBulletin  

 

Industry News <Search  <Archives  <eBulletin   Next>  


November 28, 2011

The first phase of the Valais will be delivered in December

The first phase of the Valais development will be delivered in December. Sun Hung Kai Real Estate Agency Assistant General Manager Andy Chan said: "This is our largest luxury residential development in 15 years. Valais will feature impeccable details to create a Swiss heaven by the Beas River. The private clubs cost $500 million and feature a modern design and top facilities to complete the dazzling lifestyle."
    
Project Management Department Manager Stella Woo said: "The Valais clubs received a Hong Kong Residential Building merit award from the Hong Kong Institute of Architects in May. The clubs have the leisure elegance of a Swiss garden with beautiful buildings that blend with nature. The materials and lighting have been carefully considered to bring the natural landscape indoors with sunlight and scenic views in every corner."
    
Valais is in a prestigious location and is the only large house project at Beas River. It will cover 1.7 million square feet with 330 houses in Valais I and II. Valais I will have 132 detached or semi-detached houses with large private gardens and Valais II 198, including the largest detached houses by the river.


Spa and beauty service by professional therapists and beauty products
imported from Switzerland at Aqua Spa



Pool in Lac de Morat offers a relaxing experience with lush surroundings


Chalet Morat and Chalet Zug linked to the Chalet Garden, both enjoy
the lush green view




Meteor Lounge at Lac de Morat with
ingenious installation art by world
-renowned Japanese designer
Hirotoshi Sawada






Copyright © Building.hk All rights reserved.