| TM28 The  
              lifting arrangement as viewed from the bridge tower. The barge  
              with two typical deck units on it was pulled by tug-boats in order  
              to align it into the right position for the final lifting. Rows of  
              hangers from the main cable for hanging the deck units are already  
              in place.  
                
                 
             |