| 
      
 TKO32 
       
      Maintenance       
      Depot  
      The    
        12-hectare MTR depot at Area 86 with podium structure close to completion    
        as in January 2001. A residential development is being planned on top    
        of the podium. Provision is being made for the construction of the future    
        Tseung Kwan O South Station      
       
         
         
      
      
      
      |