| 
      
      TKO15
      
       Cut-and-cover 
      tunnel between Tseung Kwan O Station and Hang Hau Station 
       
       
      The    
        eastbound tunnel linking the depot and Tseung Kwan O Station is located    
        very close to the temporary seawall where tidal control provisions are    
        required prior excavation work. Necessary realignment and temporary diversion    
        has to be carried out during tunnel excavation   
      |